成人亚洲国产精品一区图片_久久久久久毛片小说_青青热久免费精品视频在线播放_成人在线午夜福利_中文字幕欧美精品一区_欧美黄色αv大片视频_国产精品三级日本_成人免费高清观看_18禁成年无码免费网站无遮挡_精品网站在线播放欧美一区二三

中文 英文

24hour hotline

+86-15064467521

INFORMATION DETAILS

INFORMATION DETAILS

Back >Home> INFORMATION DETAILS

+86-15064467521

TEL

+86-15064467521

Weifang Luyang waterproof material Co., Ltd

ADDRESS:Industrial Park, Taitou Town, Shouguang City

CONTACT
K11 waterproof coating

K11 waterproof coating

產(chǎn)品介紹  永久性結(jié)晶型防水涂料采用進(jìn)口母料,以硅酸鹽水泥作基料,混配而成的粉末狀水泥基滲透結(jié)晶型防水涂料,產(chǎn)品質(zhì)量符合GB18445-2001標(biāo)準(zhǔn),其特點(diǎn)如下:  1、涂料中含有活性化學(xué)物質(zhì),以水為

信息詳情

1515206460787593

Product introduction

Permanent crystalline waterproof coating is a kind of powder cement-based permeable crystalline waterproof coating made of imported masterbatch and Portland cement as base material. The product quality meets the standard of GB 18445-2001, and its characteristics are as follows:

1. Active chemical substances are contained in the coating. Water is used as the medium, which gradually penetrates into the pores and crevices of concrete structure under the action of water, which catalyzes the interaction between calcium silicate and Ca (OH) 2 to form insoluble fibrous crystals in the pores and cracks.

2. The water absorption and expansion of the structure in the pores and joints makes the pores of the concrete structure dense and the micro cracks heal, effectively blocking the water channel and improving the permeability and permeability of the concrete structure.

3. After many years, the crystal can still be activated by water. Under the action of water, new crystals will continue to grow, playing a role of re impermeability, which effectively improves the incisive self-healing ability of concrete structure after re infiltration. Therefore, this product has secondary impermeability.

Scope of application

It is used for repairing and plugging all structural defects of indoor and outdoor concrete and masonry building structures, waterproof and anti-seepage of basement, roof, kitchen, toilet, swimming pool, reservoir, drinking pool, sewage pool, dam, tunnel, culvert, expressway, airport runway and concrete building facilities.

Construction steps

1. The base course shall be treated clean and flat and solid.

2. In the construction on dry base surface, the base concrete must be fully soaked with clean water, instead of only wetting the surface, until there is no open water for direct construction.

3. Each kilogram of powder is mixed with 0.36-0.4kg water to form a paste. The construction is carried out by plastering, scraping and brushing.

4. When painting, use a hard bristle brush or nylon brush to brush the prepared concrete surface by circular brushing method (brush brushing with circular motion track).

5. During the layer construction, the layer thickness must be controlled, and the material used for each square meter is 1.2-1.5kg, and that for special parts is 1.5-1.8kg

6. Maintenance is very important. When the curing of the layer will not be damaged by spraying water, the maintenance can be started. It must be carefully maintained for 2-3 days and sprayed with water 3-5 times a day.

matters needing attention

The construction temperature is 5 ℃ - 35 ℃. Avoid sun exposure, rain erosion and strong wind.

Storage: store in a dry and ventilated place

Shelf life: 12 months

K11防水涂料


相關(guān)產(chǎn)品

K11 waterproof coating

詳情信息

1515206460787593

Product introduction

Permanent crystalline waterproof coating is a kind of powder cement-based permeable crystalline waterproof coating made of imported masterbatch and Portland cement as base material. The product quality meets the standard of GB 18445-2001, and its characteristics are as follows:

1. Active chemical substances are contained in the coating. Water is used as the medium, which gradually penetrates into the pores and crevices of concrete structure under the action of water, which catalyzes the interaction between calcium silicate and Ca (OH) 2 to form insoluble fibrous crystals in the pores and cracks.

2. The water absorption and expansion of the structure in the pores and joints makes the pores of the concrete structure dense and the micro cracks heal, effectively blocking the water channel and improving the permeability and permeability of the concrete structure.

3. After many years, the crystal can still be activated by water. Under the action of water, new crystals will continue to grow, playing a role of re impermeability, which effectively improves the incisive self-healing ability of concrete structure after re infiltration. Therefore, this product has secondary impermeability.

Scope of application

It is used for repairing and plugging all structural defects of indoor and outdoor concrete and masonry building structures, waterproof and anti-seepage of basement, roof, kitchen, toilet, swimming pool, reservoir, drinking pool, sewage pool, dam, tunnel, culvert, expressway, airport runway and concrete building facilities.

Construction steps

1. The base course shall be treated clean and flat and solid.

2. In the construction on dry base surface, the base concrete must be fully soaked with clean water, instead of only wetting the surface, until there is no open water for direct construction.

3. Each kilogram of powder is mixed with 0.36-0.4kg water to form a paste. The construction is carried out by plastering, scraping and brushing.

4. When painting, use a hard bristle brush or nylon brush to brush the prepared concrete surface by circular brushing method (brush brushing with circular motion track).

5. During the layer construction, the layer thickness must be controlled, and the material used for each square meter is 1.2-1.5kg, and that for special parts is 1.5-1.8kg

6. Maintenance is very important. When the curing of the layer will not be damaged by spraying water, the maintenance can be started. It must be carefully maintained for 2-3 days and sprayed with water 3-5 times a day.

matters needing attention

The construction temperature is 5 ℃ - 35 ℃. Avoid sun exposure, rain erosion and strong wind.

Storage: store in a dry and ventilated place

Shelf life: 12 months

K11防水涂料


K11 waterproof coating 2020-12-2 本文被閱讀 941 次

+86-15064467521

National free service hotline: 400-658-0378

Contact person: Manager Cui mobile phone: 17863686802

website: iocyfa.cn

Address: Industrial Park, Taitou Town, Shouguang City


Links:

Phone

+86-15064467521

TOP